Jul 242009
 

It’s coming along. Now entering the always exciting “detailing” phase.

xab2009-07-24a.jpg  xab2009-07-24b.jpg  xab2009-07-24c.jpg  xab2009-07-24d.jpg  xab2009-07-24f.jpg  xab2009-07-24g.jpg  

The two pics below are lower rez, but show the approximate parts breakdown by color. The fuselage will be broken into left/right, fore/aft quadrants.

xab2009-07-24h.jpg  xab2009-07-24i.jpg

 Posted by at 12:04 pm

Sorry, the comment form is closed at this time.